Honeywell Alerton Building Automation System.
Works I participated in
Black gold building of Petrobras
In this work the automation system is responsible for controlling central air conditioning, lighting and alarm and fire detection.
It was the last work that I participated in this company.
Initial screen of the Norte Dor hospital.
Initial screen of the Caxias Dor hospital.
http://www.caxiasdor.com.br/
Initial screen of the Windsor Atlantica hotel.
http://windsorhoteis.com/hotel/windsor-atlantica/hoteis-em-copacabana/
Initial screen of the Guanabara Palace.
The Guanabara Palace is the address of the governor of the state of Rio de Janeiro.
In this work was implemented the building automation system for control of central air conditioning only.
Initial screen of the Unimed Rio.
Automation system deployed at the administrative headquarters in the city of Rio de Janeiro. This system includes lighting and central air conditioning control.
Initial screen of the Institute Moreira Sales.
In this customer Wellcare Automation did not implement the automation system. This was done by another company from another state. Wellcare Automation is responsible for maintaining and operating this system for this customer.
This is a screen model for fancoil control. This is a fancoil that has in addition to temperature control the humidity control of the environment and dehumidification of the environment as well.
Low floor screen model.
Low floor screen model. This is a low floor screen model. This is used to give the operator the physical location of the equipment to be controlled. It is derived from a file composed in Ato Cado and then is worked on in some graphic editor.
Initial screen of the National Institute of Technology
LAGEN Laboratory - ANNEX II
Gas and energy laboratory of the National Institute of Technology. This laboratory is part of the infrastructure of the Brazilian government. And a federal laboratory of the Brazilian Ministry of Science and Technology.
One of the functions of this laboratory is the mechanical test of gas stoves and heaters.
The intention in this case was to use automate the heater test with the intention of minimizing laboratory and other measurement uncertainty. Using the Alerton product line.
Automotion project with Auto Cad.
In the
implementation of the automotion systems, building, industrial, etc. It is
necessary that there is a project, therefore, the richness of details is very
great.
In the implementation of building automotion
systems to wich I had the opportunity to participate, to I also worked in
the confection and alteration of projects during the implementation of these
systems.
The CAD tools
was of the great importance in the produce of the screens for supervision and
assembly of the control panels.



















